    Foundation Waterproofing

    Time
    300–480 min
    Steps
    6
    Pre-check
    4 items
    Skill
    Advanced

    Scope

    Stop foundation moisture with interior and exterior waterproofing: seal cracks, apply membranes, and improve drainage to keep the basement dry year round.

    Safety

    Read before starting

    Use proper ventilation; wear protective gear; avoid working in confined spaces; check for structural issues.

    Pre-Check

    4 items · complete before you start
    0 / 28 complete

    Steps

    01

    Assess Foundation Condition

    • Inspect for cracks and damage
    • Check moisture levels
    • Identify water entry points
    • Document existing conditions
    Continue Gate:Foundation condition assessed?
    02

    Prepare Foundation Surface

    • Clean walls thoroughly
    • Repair major cracks
    • Remove loose material
    • Ensure surface is dry
    Continue Gate:Surface properly prepared?
    03

    Apply Interior Waterproofing

    • Apply waterproofing membrane
    • Install drainage mat if needed
    • Seal all penetrations
    • Allow proper curing time
    Continue Gate:Interior waterproofing complete?
    04

    Install Drainage System

    • Install perimeter drain
    • Connect to sump pump
    • Add gravel backfill
    • Test drainage flow
    Continue Gate:Drainage system working?
    05

    Apply Exterior Waterproofing

    • Excavate foundation perimeter
    • Apply exterior membrane
    • Install protection board
    • Backfill with proper materials
    Code notes
    • OSHA 1926 Subpart P: trenches ≥5 ft require a protective system (sloping, benching, shoring, or shielding); ≥20 ft requires an RPE-designed system. Spoils ≥2 ft from edge. Ladder/ramp egress within 25 ft when ≥4 ft deep.
    • Daily inspection by a competent person required before each shift in any trench.
    • Call 811 before any dig (federal Common Ground Alliance standard).
    Continue Gate:Exterior waterproofing complete?
    06

    Final Inspection & Maintenance

    • Test waterproofing effectiveness
    • Monitor for moisture
    • Schedule regular inspections
    • Document maintenance procedures