Skip to main content
    Professional
    6-8 hours

    Install New Bathtub

    Complete guide to removing old bathtub and installing a new one, including plumbing and tiling preparation.

    Progress0 of 3 steps completed

    Step-by-Step Instructions

    Step 1: Remove Old Bathtub

    2-3 hours

    Disconnect plumbing, remove surrounding tile, cut access holes if needed, and carefully remove old tub.

    💡 Pro Tips:

    • May need to cut tub into pieces for removal
    • Protect surrounding surfaces

    ✅ Expected Result:

    Old bathtub is completely removed and area is cleared

    Step 2: Prepare Installation Area

    1-2 hours

    Check and level floor, install proper framing, and prepare mortar bed if required.

    💡 Pro Tips:

    • Floor must be level and structurally sound
    • Follow manufacturer specifications

    ✅ Expected Result:

    Installation area is properly prepared and level

    Step 3: Install New Bathtub

    2-3 hours

    Position new tub, connect drain assembly, secure to framing, and test for leaks.

    💡 Pro Tips:

    • Have help moving heavy tub
    • Test drain before finishing walls

    ✅ Expected Result:

    New bathtub is installed and plumbing connections are secure

    What You'll Need

    Tools Required:

    • Reciprocating saw
    • Level
    • Adjustable wrench
    • Tile removal tools
    • Pry bar

    Materials Needed:

    • New bathtub
    • Mortar bed mix
    • Supply lines
    • Drain assembly
    • Waterproof membrane

    Task Information

    Difficulty:
    Professional
    Time:6-8 hours
    Category:Major Installation
    Steps:3

    Quick Actions